Receiving your aluminium windows and doors at home
Use this checklist on handover day, before you sign anything. Walk every room with the installer, test every opening yourself and write down every defect. It is far easier to fix a problem before sign-off than after the final payment.
Villa owners, site engineers, consultants32 items90 min
Progress 0/32· 11 must-check items left
1Delivery inspection
2Frames and finish
3Glass
4Operation and hardware
5Weather sealing and installation
6Documents, snag list and sign-off